Upgrade the PCS7 control system in an industrial plant in Doha, Qatar

Migration of Emerson Provox Leitsytems on Siemens PCS7 V6.2 (2005)
Upgrade a PCS7 control system from version 6.2 -> V7.1 including exchanges of computer technology. Delivery of the components. Upgrade of automation blocks to the latest version. Upgrade the OS images and adapt to the current screen standard.

Realization of a bottling control for technical gases

Concept development of control technology with hardware and network planning. Delivery of all necessary control cabinets for the filling and the pump controller. Programming software on Siemens Simatic Step 7 and TIA Portal V12. Realization of visualization on GE Proficy iFix base. Installation and commissioning at the customer. Creation of the complete documentation.

Configuring a process gases plant in Siemens PCS7 V8.0 with APL technology

Backdocumentation of Teleperm logics. Configuring the AS and OS software under PCS7 V8 with APL technology.
Commissioning and Loopcheckunterstützung spot.

Configuring a network Gasefüllanlage with 25 controls

Realization of a distributed mono and mixed gases filling station with gravimetric and barometric filling.
Connection of the levels to a central Füllmanagementsystem with data exchange in production and recipe data.
Development of a superior visualization system to monitor the production processes and the creation of reports.
Integration of gas detection and ventilation technology on bus technology (Modbus / Profibus)

Natural gas liquefaction plant in Hammerfest, Norway

Specification of MSR components for WWTP. Development of procedures for the control system programming and commissioning of the MSR technology in collaboration with the ABB control system and preparation of the whole documentation.

LindeLE-Logo

LindeTG-Logo

LindeLE-Logo